St. Louis’ Premier Colocation Platform

St. Louis is a major hub for traffic and is a principle interconnection point between carriers, service providers and enterprise customers in the region. 900 Walnut, a 100,000-square-foot building offers customers access to over 45+ network operators.

Building Specifications

connectivity

  • Premier core interconnection site in St. Louis
  • Direct interconnection available to 210 North Tucker
  • Carrier neutral, building owned and managed data center
  • Network operators: 45+
  • Points of entry ("POE"): 4 diverse POEs
  • Risers: pre-built innerduct system from POEs to Meet Me Room
  • Colocation: cabinets and cages available

infrastructure

  • Ceiling heights (slab to slab): 11'6"-14'
  • Column spacing 15' - 21'
  • Floor loading: 200-300 lbs/sf
  • Secure loading area
  • Freight elevators: 3,500 lbs capacity
  • Fire suppression: pre-action, dry pipe
  • Cable management: overhead ladder rack
  • Outside the 500-year floodplain
  • 24/7 network operations center ("NOC")

cooling

electrical

  • Utility feeds: diverse feeds at 13,800v
  • Utility power: 13,000 kW
  • Backup generator power: 5,000 kW
  • DC pair distribution available

security

  • Key card access throughout the entire facility
  • Video surveillance
  • 24/7 access to authorized customer personnel via access lists
  • MMR access: two factor authentication

amenities

  • Vendor touch-down space for clients (at 210 North Tucker)
  • Tech lounge (at 210 North Tucker)
  • Tenant meeting and conference rooms (at 210 North Tucker)
  • Secure storage space available
  • Shared office environment available